Application Overview

Underground tunneling involves creating underground tunnels and access routes for mining operations. Rock drilling is a critical part of the tunneling cycle: tunneling rigs carry out the necessary drilling tasks at the working face in accordance with the mine’s design specifications, thereby preparing the site for subsequent operations.

Work Process

First, determine the dimensions of the working face, rock conditions, drilling requirements, and supporting conditions such as power and water supply, and verify equipment access and working space.

  1. Drilling Rig Preparation: Once on-site confirmation confirms that operations are permitted, position the equipment, conduct a status check, and prepare for operations.
  2. Rock Drilling: Complete drilling in accordance with the project’s drilling design, ensuring that hole locations, directions, and depths meet specifications.
  3. Inspection and Handover: Conduct post-drilling inspections and complete the handover to the next work phase to ensure a smooth transition to subsequent tunneling operations.

Selection Guidance

To help you choose the right equipment for your mine, Xuri Mining Machinery offers specialized, customized solutions based on conditions such as mine tunnels, rock types, and geological features. The specific criteria for equipment selection are based on the following factors:

  • Tunnels and Access Conditions: Tunnel width, height, narrowest points, curves, gradients, and space occupied by utility lines.
  • Drilling Coverage Area: The equipment is selected based on the shape of the work surface, the hole locations, and the drilling direction.
  • Rock and Geology: Information on rock types, strength or hardness, abrasiveness, fractures, and groundwater conditions also serves as an important basis for selecting the appropriate equipment.
  • Drilling Requirements: Hole diameter, hole depth, drilling direction, and workload, confirm the appropriate rock drill model based on these specifications.
  • On-site Support: Consider the on-site support requirements, including power supply voltage and frequency, water supply, drainage, ventilation, and any other conditions necessary for the selected configuration.
  • Equipment Maintenance: It is also necessary to take into account shifts, the number of working faces, relocation frequency, maintenance conditions, and spare parts requirements; evaluate equipment usage schedules in conjunction with the entire tunneling cycle.

Relevant Equipment

CYTJ45 Underground Drill Rigs: Used for standard single-arm tunneling and rock drilling; suitable for cross-sections ranging from 12 to 45 square meters.

CYTJ45(A) Underground Drill Rigs:Suitable for small-scale tunnel excavation; specifically designed for small cross-sections, 6-22 square meters.

Service Support

Xuri Mining Machinery not only provides customers with suitable products and equipment, but also ensures key factors that impact operations, such as equipment accessories, spare parts, and after-sales technical support, are fully addressed, thereby minimizing downtime and wait times.

Contact Xuri Mining Machinery